Modify transmittal TRN-2025-0048 — Cipla Research Lab Fume Hood Drawings
Last modified: 08 Feb 2025, 14:32 IST by Suresh Iyer
Transmittal Details
Draft
Dr. Anand Kulkarni — Cipla
M/s Arup Engineers
Rajesh Mehta — Cipla Projects
Priya Sharma
DRDO — Project Director
M/s Larsen & Toubro
MEP Contractor
Vikram Desai
Tata Projects — Site Engineer
Dr. Neha Joshi
Sun Pharma — Lab Manager
M/s Voltas Engineering
HVAC Consultant
Arvind Patel
Biocon — Facility Head
Attached Documents (6 documents)
| # | Document No. | Title | Rev | Format | Status | Actions |
|---|---|---|---|---|---|---|
| 1 | DWG-FH-2025-101 | Fume Hood Assembly — Type A (1500mm) General Arrangement | R3 | Approved |
|
|
| 2 | DWG-FH-2025-102 | Fume Hood Assembly — Type B (1800mm) Section Details | R2 | Approved |
|
|
| 3 | TDS-FH-2025-047 | Technical Data Sheet — Fume Hood Type A (1500mm Epoxy Top) | R2 | DOCX | Approved |
|
| 4 | TDS-FH-2025-048 | Technical Data Sheet — Fume Hood Type B (1800mm PP Lined) | R1 | DOCX | Under Review |
|
| 5 | DWG-EXH-2025-033 | Exhaust Duct Routing Layout — Lab Block A, Level 2 | R4 | Approved |
|
|
| 6 | RPT-MAT-2025-019 | Material Compliance Report — Epoxy Resin Worktop (IS 4833) | R1 | Final |
|
Change Log
4 entriesSI
Edit
08 Feb 2025, 14:32 IST
Updated Cover Note — Added reference to review meeting dated 02 Feb 2025 and listed key changes to fume hood specifications.
SI
Edit
07 Feb 2025, 10:15 IST
Added document RPT-MAT-2025-019 (Material Compliance Report — Epoxy Resin Worktop).
Changed Subject from "Fume Hood Assembly Drawings — Cipla Vikhroli" to "Fume Hood Assembly Drawings & TDS — Cipla Vikhroli Phase 2".
Changed Subject from "Fume Hood Assembly Drawings — Cipla Vikhroli" to "Fume Hood Assembly Drawings & TDS — Cipla Vikhroli Phase 2".
RK
Edit
06 Feb 2025, 16:48 IST
Added recipient Rajesh Mehta — Cipla Projects.
Changed Due Date from 15 Feb 2025 to 20 Feb 2025 per project schedule revision.
Changed Due Date from 15 Feb 2025 to 20 Feb 2025 per project schedule revision.
SI
Created
05 Feb 2025, 09:30 IST
Created transmittal TRN-2025-0048 with 5 documents for project Cipla Research Lab, Vikhroli. Initial recipients: Dr. Anand Kulkarni (Cipla), M/s Arup Engineers. Purpose: For Review.